NASA delays Artemis 1 launch again
Following a failed attempt earlier this week, NASA has once again delayed the start of its Artemis 1 Moon mission. The agency was forced to scrub Saturday’s launch after staff at Kennedy Space Center failed to fix a persistent leak in a liquid hydrogen connection point on the agency’s next-generation Space Launch System super heavy-lift rocket.
NASA detected the leak at 7:23AM ET and tried to troubleshoot the problem in a few different ways, but after three failed attempts ground crew recommended a “no go” for Saturday’s launch attempt. Monday’s attempt was cut short after one of the four on the SLS could not reach the appropriate temperature to send Artemis 1 into space.
The #Artemis I mission to the Moon has been postponed. Teams attempted to fix an issue related to a leak in the hardware transferring fuel into the rocket, but were unsuccessful. Join NASA leaders later today for a news conference. Check for updates: https://t.co/6LVDrA1toypic.twitter.com/LgXnjCy40u
— NASA (@NASA) September 3, 2022
“The Artemis I mission to the Moon has been postponed. Teams attempted to fix an issue related to a leak in the hardware transferring fuel into the rocket, but were unsuccessful,” <a class="colorbox" …read more